Take the No Love for Litter Pledge

About the Project

I-66 Eastbound Direct Access Ramp to Metro

This project, part of the I-66 Inside the Beltway improvements, will provide direct access from eastbound I-66 to the West Falls Church Metro station by constructing a new ramp connection between two existing ramps (eastbound I-66 to Route 7 and the eastbound I-66 collector-distributor road adjacent to the station's parking garage).

Currently, vehicles exit from I-66, turn right to head south on Route 7, turn left at the signalized intersection at Haycock Road, and then turn left onto Falls Church Drive. VDOT has identified operational and safety issues with this maneuver, especially during morning and evening peak periods. This direct access will save motorists bound for the Metro station time and reduce traffic on already congested Route 7 in these two intersections.

All improvements will be performed within existing VDOT right-of-way.

Crews install a new bridge beam over Leesburg Pike as part of widening the ramp from eastbound Leesburg Pike to I-66 East. (August 28, 2020)

Newly installed beams over Leesburg Pike will widen the bridge to accommodate vehicles traveling from I-66 East toward the West Falls Church-VT/UVA Metrorail Station. (September 1, 2020)

The exit ramp from I-66 East to Leesburg Pike is being widened as part of the ramp improvement. (August 5, 2020)


Anticipated Schedule Dates
Construction of I-66 Eastbound Direct Access to Metro Project April 2020 to Late 2020

Resources
Interchange Modification Report (PDF 22.5MB)
Environmental Document (Categorical Exclusion) (PDF 21KB)
Conceptual plan sheets: 1 (PDF 570KB) | 2 (PDF 595KB)